Efficient operations with Pre-installed Cable Protector

Move cable clamping operations on the rig floor saving up to 12 hours when running completions.
04/25/2022
OCTG

Cable clamping today is a time-consuming, risky operation with several pain points. Working around tubulars is where most injuries occur on the rig floor. Standard clamping operations involve waiting until the pipes are made-up on the drill floor and then aligning the clamp over the cables before fitting two straps and tightening two bolts. 

The operation typically takes over 2 minutes and involves 2-3 people in the danger zone with the risk of injury and clamps dropping downhole. The additional logistics of transporting and handling cable clamp crates to the rig floor incurs costs and frequent delays to running operations. 

To tackle these challenges, Vallourec has developed the world’s first Pre-Installed Cable Protector, moving most of existing operations from the rig floor to the yard. The protector generates safety benefits and significant rig time savings. The protector is pre-installed in the pipe yard, easily captive in the pipe, and transported ready for make-up. In addition to fewer risks, there are logistics and efficiency gains in completion running operations.

Installing the rig is simple and quick as the cables are secured by only one operator in just two turns of one tool, with no special powered equipment required. Operations become safer as less personnel work in the red zone and there is less risk of parts falling in the well per new installation site.  

In addition to time saving and rig safety, Vallourec offers tailor-made, cable adjustment services and training available worldwide.

The protector is compatible with the product lines:

  • ½” and 4 ½” VAM® family
  • 5 ½” VAM TOP ® (HT/HC) and VAM® 21 for standard and harsh environment.
  • Extended size range up to 7”.
  • Any T&C connection on request.
  • Slimline versions.

Vallourec offers seamless and welded tubes, accessories, services, and digital solutions that enhance customer operations. Moreover, it works on research and development (R&D) to optimize field activities, ensure more safety when handling equipment, and improve performance in the rig site.